Skip to main navigation | Skip to main content

Login to your account here

Client login

Latest News

Backing up the Manor

Backing up the Manor

Brief:

Supply a 45kVA Diesel Generator and automatic transfer panel to supply backup power in the event of a mains failure.

Located in rural Hampshire, the end client wanted to ensure that even though they would be the first affected in a power cut, they would not be too long before they could resume their normal lives, no matter when the power would be restored.

Solution:

JS Power, working with the client, supplied a 45kVA Diesel generator and automatic transfer panel. JS Power generators are designed to be up, running as soon as possible upon a mains failure. Typically 10 – 15 seconds.

Using a heavy duty industrial Perkins engine, with a base fuel tank of 220 litres the generator will be able to cope with a power outage of up to 20 hours at full load.

Back to main Latest News page »

Back to top