Testing Times

  • Diesel generator being delivered by crane

Brief:

Supply a prime power solution to allow a client to test their products before despatch.

Our client, a sonar equipment manufacturer / supplier required a generator to allow them to test their products prior to despatching them around the world.
The equipment on site would require a large amount of power when starting their equipment up, but then the loads would drop down significantly.

Solution:

Working with the client and their electrical sub contractor, JS Power supplied a 45kVA diesel generator with a 60kVA alternator. This allows for the larger start up, but avoids the engine been put under light load conditions when the demand drops.

Also to ensure that the generator remains in the best of health, a quarterly load test will be performed.